Project Overview
- Mass removal of pigeon guano
- Hazardous waste handling, specialist cleaning equipment, compliant disposal.
Challenge
The vacant site had accumulated a significant volume of pigeon guano, creating a serious health hazard and preventing any further use or redevelopment of the property. The contamination posed safety and compliance risks, with the site effectively at a standstill until the waste was removed safely.
Our Solution
Our team attended site with the right equipment and experience to handle the job safely. We carried out a full clearance using specialist cleaning methods designed for hazardous environments, carefully removing the guano without spreading contamination. All waste was handled and disposed of correctly, ensuring the site met health and environmental requirements.
Results
We successfully removed 620kg of pigeon guano, eliminating health risks and restoring the site to a safe condition. With the clearance complete, the client was able to move forward with inspections, planning, and preparations for future tenancy. The site is now clean, compliant, and ready for its next steps.